Plan on needing extra travel time as the DOT is doing the work on a 1.1 mile stretch of the northbound side of the highway between Exits 3 and 4 until 2:15 p.m. today. Sign up for Greenwich Patch news alerts to stay on top of the latest traffic news and more by clicking here .
http://patch.com/connecticut/greenwich/road-work-greenwich-lane-closure-0?
http://patch.com/connecticut/greenwich/road-work-greenwich-lane-closure-0?
No comments:
Post a Comment